Transformer radiator powder coating: a plant in Suqian, Jiangsu
A radiator supplier in Suqian, Jiangsu had orders from new-energy transformer builders growing faster than their outsourced coating could absorb. The project was a capacity question first and a coating question second: how much line fits in the hall they already had.



The parts
Transformer radiators and small welded panels, mixed batch sizes, coated to order rather than to stock.
What the line had to solve
- Floor space: the hall was already occupied, so line length – pretreatment, oven, cooling – had to be compressed without breaking cure.
- Output peaks: orders arrive in waves, so the line needed headroom at the booth and a buffer at load/unload.
- Coating both sides of a panel stack in one pass to avoid a second handling cycle.
- Keeping film consistent when the batch changes from small panels to tall radiators within a shift.
How the line is built
- Compact pretreatment with shorter inter-stage drip times, plus a U-shaped layout so the oven and cooling tunnel share the available length.
- Two-sided gun arrangement with carriages that can be switched between a short stroke for panels and a long stroke for radiators.
- Conveyor speed set by the peak output target with a margin, and variable frequency drive so slower speeds can be used for heavy parts.
- Load and unload stations doubled up so a batch change does not stop the line.
Acceptance and handover
The acceptance protocol covered film thickness on both faces of a fin stack (measured at three heights), adhesion class 0-1, colour match against a master panel, and a full-shift run at the target output to prove the line could hold cycle time.
Customer name withheld. Layout drawings available on request.