Transformer Radiator Coating Line, Jiangsu

Transformer radiator powder coating: a plant in Jiangsu

This Jiangsu radiator plant had the opposite problem to a greenfield project: they already coated radiators, and the rejects were all in the same two places – pinholes along welds, and thin film inside the fin stack. The project was a rebuild of pretreatment and the spray zone rather than a new building.

Powder coating line oven bank for transformer radiators
Oven bank on the line.
Cure oven of a transformer radiator powder coating line
Cure oven in operation.
Automatic gun bank set for powder penetration into radiator fins
Gun bank angled into the fin stack.

The parts

Welded transformer radiators, fin pitch roughly 8-15 mm, panels coated in black, grey and RAL colours for different transformer makers.

What the line had to solve

  • Weld oil and drawing compound on incoming panels cause pinholes and adhesion loss; a three-stage wash was not removing them.
  • Fin gaps act as a Faraday cage: powder reaches the outer fins and starves the inner ones.
  • Radiator edges take more powder than flat faces, so film runs high at edges and low in the middle unless the gun path is adjusted.
  • Rework on a coated radiator means stripping the whole part – rejects are expensive, so first-pass coverage matters.

How the line is built

  • Pretreatment rebuilt to four stages with an alkaline degrease matched to the weld oil actually used, a rinse, a conversion coating, and a final demineralised rinse.
  • Gun arrangement changed: carriages angled into the fin stack from both sides at a shorter distance, with an extra pass at low line speed for deep stacks.
  • Voltage and current set per zone rather than one setting for the whole booth, so the fin interior gets penetration without overcharging the edges.
  • A test panel from each batch is coated first and checked for film and adhesion before the batch runs.

Acceptance and handover

Acceptance focused on the two failure modes: no pinholes on a weld sample after a salt-spray check, and film inside the fin stack within 60-80 um at the middle fin, not just the outer one. Adhesion to ISO 2409 class 0-1, and a documented cure check per shift.

Customer name withheld. Reject-rate data before and after can be discussed under NDA.

Related

Powder coating line · Powder coating booth · Curing oven · Pretreatment · Watch a radiator line running

Send your radiator drawing for a line layout

BestCoatingLine

Powder coating lines, liquid painting lines and turnkey coating solutions. Designed, built and test-run at our production base in Zhongshan, Guangdong, China.

WhatsApp / WeChat: +86 156 0291 6761

[email protected]

Registered office

Sales departmentRoom D327, No. 42 Caiyun Road,
Longcheng Street, Longgang District,
Shenzhen, Guangdong, China

CompanyBEST MACHINES & EQUIPMENTS CO., LTD.

Production base

Project officeNo. 6-1, Dongsheng Road, Dongsheng Village,
Minzhong Town, Zhongshan,
Guangdong, China

Assembly base

Machining & assemblyChashan, Dongguan,
Guangdong, China

Working hoursMon-Sat, 08:30-18:00 (GMT+8)

© 2016-2026 BEST MACHINES & EQUIPMENTS CO., LTD. All rights reserved. Coating line solutions since 2016
Scroll to Top