Powder Coating Line

PRODUCT LINE

Turnkey Electrostatic Powder Coating Lines

A powder coating line is a chain of matched stations, not a list of separate machines. We engineer pretreatment, booth, recovery, curing oven and conveyor around one workpiece, one output target and one factory layout.

Get a quotation

Every line starts from four numbers: the largest workpiece (L x W x H), the coating type (epoxy, polyester, hybrid or special effect), the required output per shift, and the floor space you have. From those we size the number of pretreatment stages, the booth width and gun count, the oven length, and the conveyor speed and pitch.

Configurations run from a compact single-booth line for small batches to a fully automatic multi-booth line with reciprocators, fast colour change and automatic powder feeding. Heating can be LPG, natural gas, diesel or electric depending on what is available and cheapest on your site.

The line is assembled and test-run in our partner plant before shipment. You get the layout drawing for approval, weekly production photos, a trial-run video, and full installation drawings for your local rigging team.

Powder Coating Line

What is included

  • Pretreatment with 3, 4 or 5 stages, dipping or spraying type
  • Powder booth with cyclone, mono-cyclone or cartridge recovery
  • Curing oven sized by coating chemistry and line speed (typically 180-200 C)
  • Overhead or power-and-free conveyor, 0.5-6 m/min
  • PLC with touch-screen control and recipe storage
  • Pre-shipment trial run with video report

Typical specifications

ItemTypical specification
Line speed0.5 – 6 m/min, variable
Workpiece sizecustom, typically up to 1500 x 1000 x 800 mm
Pretreatment stages3 – 5 (degrease, rinse, conversion coat, passivation)
Curing180 – 200 C, 15 – 20 min metal temperature
Heating optionsLPG / natural gas / diesel / electric
ControlPLC with touch screen and fault alarms

Not sure which configuration fits your parts?

Send us your workpiece size, coating type and required output per shift. We reply with a line proposal and a budget range within one working day.

Request a quotationChat on WhatsApp

Where powder coating lines are used

Electrostatic powder coating suits any metal part that needs a hard, uniform, corrosion-resistant film and can pass through an oven. In our export projects the most common product families are:

  • Metal furniture, shelving, lockers and racks
  • Electrical enclosures, switchgear and control cabinets
  • Automotive and motorcycle parts, brackets and shock absorbers
  • Home appliances: fridge panels, washing machine drums, oven bodies
  • Architectural profiles, fencing, gates and aluminium frames
  • Agricultural machinery, pumps, valves and pipe fittings

If your part is heat-sensitive, heavier than the conveyor can carry, or needs a metallic or high-gloss finish, tell us at the quotation stage — that usually points to a liquid painting line instead.

Five numbers that decide the line size

  1. Largest workpiece (L x W x H, plus hanger height) — sets booth width, oven opening and conveyor pitch.
  2. Output per shift in m² or pieces — sets line speed and the number of booths and guns.
  3. Coating type and film thickness — epoxy, polyester, hybrid or special effect, and 40–120 µm target.
  4. Heat source available on site — LPG, natural gas, diesel or electric; we size the burner and oven accordingly.
  5. Floor space and ceiling height — decides whether the line runs straight, in an L shape, or with a return loop.

Send us these five numbers with a photo or drawing of the part and we will come back with a layout drawing, a machine list and a price in one document — usually within two working days.

Frequently asked questions

How long does a powder coating line take to build and deliver?

Standard single-booth lines normally take 35–50 days from drawing approval to shipment; multi-booth automatic lines with fast colour change take 50–75 days. Sea freight to the Middle East is about 25–30 days, to South America 30–40 days.

Can the line run on the power and gas we already have?

Yes. Before we finalise the electrical drawing we ask for your site voltage (380 V / 415 V / 440 V, 50 or 60 Hz) and the heat source you can supply. Burners, motors and the PLC are selected for that, so no step-down transformer is needed on site.

Do you install and commission the line?

We can send an engineer team for installation supervision and commissioning, or supply full drawings and a video commissioning guide for your own rigging team. Both options are quoted separately, and the choice is yours.

What about spare parts and after-sales?

Guns, venturi tubes, powder hoses, filters, thermocouples and PLC spares are kept available for at least 8 years after delivery, and we ship small parts by air courier so a line is never stopped for a long time.

Is a trial run done before shipment?

Yes. The line is assembled and run in our partner plant, and you receive a video of the trial run together with photos of the packed shipment before the containers leave.

Related equipment in a powder line

Most powder lines are built from the pages below. Open the one you need, or send us your part drawing and we will match the combination for you:

Pretreatment · Powder coating booth · Curing oven · Conveyor · Reciprocator · Liquid painting line

Send your part drawing for a line layout

BestCoatingLine

Powder coating lines, liquid painting lines and turnkey coating solutions. Engineered with specialist partner plants in Guangdong, China.

WhatsApp / WeChat: +86 156 0291 6761

[email protected]

Registered office

Sales departmentRoom D327, No. 42 Caiyun Road,
Longcheng Street, Longgang District,
Shenzhen, Guangdong, China

CompanyBEST MACHINES & EQUIPMENTS CO., LTD.

Production base

Project officeNo. 6-1, Dongsheng Road, Dongsheng Village,
Minzhong Town, Zhongshan,
Guangdong, China

Assembly base

Machining & assemblyChashan, Dongguan,
Guangdong, China

Working hoursMon-Sat, 08:30-18:00 (GMT+8)

© 2016-2026 BEST MACHINES & EQUIPMENTS CO., LTD. All rights reserved. Coating line solutions since 2016
Scroll to Top