PRODUCT
High Quality Liquid Painting Line
A complete wet painting line: water-curtain spray booth, flash-off zone, baking oven, conveyor and controls, for primer and topcoat work on metal parts.
The line is laid out as booth – flash-off – oven in a straight run, with the conveyor passing through all three. Painting can be manual, with reciprocators, or with automatic guns on a fixed bridge, depending on the finish consistency you need.
For solvent-based paint the booth and electrics are explosion-proof and the exhaust is sized to keep solvent concentration inside safe limits. For water-based paint we supply a dry-filter booth with stainless wetted parts.
- Water-curtain booth with sludge skimmer
- Flash-off zone sized to the solvent data sheet
- Baking oven 140-160 C, PID controlled
- Manual, reciprocator or automatic gun systems
- Overhead chain conveyor with VFD
- Explosion-proof electrics on solvent lines



| Item | Typical specification |
|---|---|
| Line speed | 0.5 – 4 m/min |
| Baking | 140 – 160 C, 20 – 30 min |
| Coating | primer + topcoat, metallic, high-build |
| Booth | water curtain or dry filter |
| Heating | gas / diesel / electric |
Not sure which configuration fits your parts?
Send us your workpiece size, coating type and required output per shift. We reply with a line proposal and a budget range within one working day.
Built for multi-coat finishes
This line is specified when the finish has to look good as well as last: primer plus top coat, or top coat plus clear coat, in one continuous pass. Each booth has its own extraction and its own flash-off zone, so coats do not pick up overspray from the next stage.
- Automotive parts and wheels needing primer + top coat
- Appliance panels with high-gloss or metallic finishes
- Machinery covers and generator housings
- Parts with soft-touch or textured effects
How the line is laid out
Loading → spray booth 1 → flash-off tunnel → spray booth 2 → flash-off → curing oven → cooling → unloading. The flash-off length is calculated from the paint supplier’s recommended time at your line speed, and the oven curve is set for the total wet film rather than a single coat.
Water curtain booths are standard on this line; dry filter booths can be substituted for low volume or for frequent colour changes. Solvent-based, water-based and UV-cured paints are all supported.
Questions buyers ask
Can we run one coat today and two coats next month?
Yes. The second booth and flash-off zone can be bypassed, so a single-coat job runs a shorter route while a two-coat job uses the full line.
What paint data do you need from our supplier?
Viscosity, recommended film thickness, flash-off time, curing curve and whether the paint is solvent-based, water-based or UV. With that we finalise booth airflow, flash-off length and oven zones.