Pretreatment

PRODUCT LINE

Pretreatment: Dipping and Spraying Lines

Most coating failures – adhesion loss, blistering in salt spray, peeling at edges – start in pretreatment, not in the powder. We supply dipping and spraying lines in 3, 4 or 5 stages.

Get a quotation

A dipping line uses tanks with a travelling hoist and programmed dwell times: load, degrease, rinse, conversion coat, rinse, passivate, unload. It suits complex geometry and low-to-medium output, and is the cheapest way to get a full multi-stage process.

A spraying line is a tunnel with spray arches and a conveyor through it. It suits flat and simple parts at high output and uses less chemical per part, but cannot reach inside cavities the way immersion can.

Tank materials: rubber-lined steel for alkaline stages, SS304 or PP for acid stages. Heating by electric immersion, gas or steam. We also size the drying oven that follows, otherwise parts carry water into the powder booth.

Pretreatment

What is included

  • 3, 4 or 5 stages: degrease, rinse, phosphate, rinse, passivate
  • Dipping type with hoist and PLC programme control
  • Spraying tunnel with spray arches
  • Tanks in rubber-lined steel, SS304 or PP
  • Electric, gas or steam heating
  • Drying oven after the final rinse

Typical specifications

ItemTypical specification
Typedipping (immersion) or spraying (tunnel)
Stages3 – 5
Tank materialrubber-lined steel / SS304 / PP
Heatingelectric immersion / gas / steam
Dryinghot air, 80-120 C

Not sure which configuration fits your parts?

Send us your workpiece size, coating type and required output per shift. We reply with a line proposal and a budget range within one working day.

Request a quotationChat on WhatsApp

Pretreatment decides whether the coating lasts

Most coating failures we are asked to diagnose — blistering, flaking at bends, rust at welds — start in pretreatment, not in the powder or the paint. A correct sequence removes oil and oxide, converts the surface, and leaves it dry and dust-free before the part enters the booth.

  • 3-stage — degrease, rinse, conversion coat: for indoor parts and light service
  • 4-stage — adds a passivation rinse: for outdoor or humid service
  • 5-stage — adds a second clean rinse or DI rinse: for high finish standards
  • Dipping or spraying — dipping suits complex shapes; spraying uses less chemical and floor space

Tanks are sized from part size and throughput, with heating, filtration, skimming and a drying oven matched to the line speed. Effluent can be routed to a simple pH adjustment pit if your local rules require it.

How to pick the number of stages

  1. Substrate: cold-rolled steel, galvanised, aluminium or stainless
  2. Service environment: indoor, outdoor, coastal or chemical
  3. Required salt-spray hours, if your customer specifies them
  4. Water hardness on site — decides whether a DI rinse is needed
  5. Available floor space and heating source

Frequently asked questions

Can we skip pretreatment for indoor parts?

You can, but adhesion and corrosion resistance drop sharply and warranty claims usually follow. Even a 3-stage sequence costs far less than rework, and it is the part of the line most worth getting right.

How much chemical and water does a 4-stage line use?

Consumption depends on drag-out and part area. As a guide, a spraying line with good drainage uses 40–80 litres of rinse water per hour per stage, and chemicals are replenished by titration rather than by fixed schedule.

Do you supply the chemical recipe?

We supply the tank layout, temperatures and dwell times, and can recommend chemical suppliers who deliver to your port. The actual product choice is usually made with a local or regional supplier so that replenishment is fast.

BestCoatingLine

Powder coating lines, liquid painting lines and turnkey coating solutions. Engineered with specialist partner plants in Guangdong, China.

WhatsApp / WeChat: +86 156 0291 6761

[email protected]

Registered office

Sales departmentRoom D327, No. 42 Caiyun Road,
Longcheng Street, Longgang District,
Shenzhen, Guangdong, China

CompanyBEST MACHINES & EQUIPMENTS CO., LTD.

Production base

Project officeNo. 6-1, Dongsheng Road, Dongsheng Village,
Minzhong Town, Zhongshan,
Guangdong, China

Assembly base

Machining & assemblyChashan, Dongguan,
Guangdong, China

Working hoursMon-Sat, 08:30-18:00 (GMT+8)

© 2016-2026 BEST MACHINES & EQUIPMENTS CO., LTD. All rights reserved. Coating line solutions since 2016
Scroll to Top